In order to get the cylinder inside the circle, it needs to be JB Welded on the inside and outside edges of the Radar Eye. I applied tape to the outside of the circle to provide the JB Weld a good backing for filling in the holes and grooves between the cylinder and circle. Once that is all filled in, it dries for 24 hours. Once dry the tape is peeled off and the JB Weld is sanded down to make the eye appear seamless.
Watch movie online The Transporter Refueled (2015)
Once the main body of the Radar Eye is sanded, it needs to be fitted to the dome and make sure it looks as flush as possible.
Watch Part V to see the Side Detail of the Radar Eye.